Continuing from my previous post, we get to Friday and the repair work starts. You can see the leaning sleeper wall on the left, so our first task was to re-build it to make it straight. The sleeper wall is the first layer of the flooring sandwich and goes from the foundations of the house up to the bottom of the wooden joists.
Then we built a new lattice of joists for the floorboards to be attached to. The joists are treated for woodworm and rest on top of the sleeper walls.
1 comment:
Lord! Looks like you have your hands full there. Making good progress though, I'm very impressed and I'm sure it'll be worthwhile when it's all done.
Post a Comment