The sleeper wall which the joist rest on slid sideways in the Summer and we have now got to re-build the wall, replace the joist (3) and put down new floorboards in our lounge - in the coldest week of the winter!!!
The first photo shows DH getting started and replacing the wiring etc for the electric sockets.
This is the slab of concrete used to cover the original fireplace - it all fell apart when we removed the floorboards, so we have some bricking etc to do before going any further. We are also putting in a radiator and rewiring everything down here. I think the original work done in the 70's was done by Bodgit & Messy. The house was built in 1939 but was 'improved' in the 70's